//Factories and Machinery Act 1967 Malaysia: 2024 Repeal

Factories and Machinery Act 1967 Malaysia: 2024 Repeal

The Factories and Machinery Act 1967 (Act 139) was Malaysia’s statute for factory safety and for the registration and inspection of machinery. The Factories and Machinery (Repeal) Act 2022 [Act 835] repealed the 1967 statute with effect from 1 June 2024, and the Occupational Safety and Health Act 1994 [Act 514], as amended by Act A1648, now carries the duties that the Department of Occupational Safety and Health (DOSH) enforces. The old Act named the conveyor as machinery. The 1994 Act works through employer duties, risk assessment and a short list of plant that needs a certificate of fitness, and conveyors sit under an exclusion from that list.

Act 139 regulated factories and the machinery inside them

Act 139 regulated factories and the machinery inside them by joining safety duties, machinery registration and periodic inspection in one statute. Its long title promised “the control of factories with respect to matters relating to the safety, health and welfare of person therein, the registration and inspection of machinery”. The Factories and Machinery Act 1967 came into force on 1 February 1970 [P.U.(B) 5/1970], and the text read here is the 1974 revision with later amendments, including Act A1268, folded in.

Section 2(1) defined a factory by the work done, not by the building. Premises counted when people did manual labour on an article for trade or gain, and the definition then added “any premises in which the business of washing or filling bottles or containers or packing articles is carried on incidentally to the purposes of any factory”. A bottling hall or packing area that served a plant therefore fell inside the Factories and Machinery Act as part of the factory. Contrary to a common assumption, the Act was not limited to heavy plant such as boilers; its factory definition reached packing floors too.

Section 3 named the conveyor as machinery

Section 3 named the conveyor as machinery through the definition of materials handling equipment in Act 139. The definition of machinery listed steam boilers, unfired pressure vessels, prime movers, transmission machinery, driven machinery and materials handling equipment. It excluded manually driven machinery (other than hoisting machines), machinery used solely for private and domestic purposes, and office machines. “Materials handling equipment” meant “any power-driven equipment for handling materials”, with forklift, conveyor and stacker among the named examples.

A power-driven conveyor on a Malaysian line was therefore machinery in the plain words of Act 139, and every duty that attached to machinery attached to it. DNC Automation engineers and commissions conveyor lines under its conveyor system automation service, so this definition is the one that placed such a line inside the Act and brought the Act’s duties with it.

Sections 15 to 18 put guarding and compliance duties on users, builders and sellers

Sections 15 to 18 put guarding and compliance duties under Act 139 on the user of a machine and on the people who built, sold or imported the machine. Section 15 required that “every dangerous part of any machinery shall be securely fenced”. One proviso applied: where a fixed guard could not secure safety because of the operation itself, a device that automatically stopped the operator coming into contact with the part satisfied the section.

Section 17 of Act 139 barred the sale or hire of machinery that did not comply with the applicable regulations (transmission machinery excepted). Section 18 barred manufacture, repair and installation in breach of the Act, and it barred import of non-compliant machinery. Section 29A added a licence-style control: no person could manufacture, fabricate, test, install, maintain, dismantle or repair prescribed machinery without a written authority from the Chief Inspector. The duty ran from the factory floor back to the supplier’s workshop. That reach was wide. Two further sections extended it in time, to the moment before installation and to the years after it.

Sections 36 and 40 added approval before installation and inspection after installation

Sections 36 and 40 added approval before installation and inspection after installation. Section 36(1)(a) said no person shall install or cause to be installed “any machinery in any factory” without the written approval of the Inspector. Section 40(1) required factories and machinery without a prescribed certificate of fitness to be inspected at prescribed periods.

The penalties scaled with the clause. Contravening section 36(1) of the Factories and Machinery Act carried a fine of up to RM100,000, imprisonment of up to two years, or both under section 51(1), while other contraventions of the Act carried up to RM50,000 or one year under section 51(2). The detail of what “securely fenced” meant came from regulations made under the Act, and for conveyors and bottle lines that detail sat in the 1970 fencing regulations.

What’s the Difference Between a Smart Factory and Smart Manufacturing?

What’s the Difference Between a Smart Factory and Smart Manufacturing?

The 1970 fencing regulations wrote conveyor and filling rules into law

The Factories and Machinery (Fencing of Machinery and Safety) Regulations 1970 wrote conveyor and filling-machine rules into law beneath Act 139. The revised 1983 text [P.U.(A) 113/1983] ran to 44 regulations. DOSH’s list titles the same instrument the Guarding of Machinery and Safety Regulations 1970 and shows it under “Rules That Have Been Abolished” without a repeal date. The figures below are therefore history, and a design baseline rather than a current legal minimum.

READ:  Automated Carton Packaging Systems

Four provisions of the regulations under Act 139 touched equipment that DNC Automation builds or integrates, and the table sets each one against its place on a line.

RegulationWhat it requiredWhere it sits on a line
Reg 4(1)Every dangerous part of every driven machine, prime mover and transmission machinery securely fencedChain drives, gearboxes and rollers on any machine
Reg 10(1)An efficient starting and stopping appliance, reachable from the operator’s normal working positionThe start and stop station of each machine
Reg 39Pressure-filling machines for glass bottles fenced by a sheet or mesh guard with no opening larger than one quarter of an inch (0.25 in / 6.35 mm); glass-bottle capping machines given a supporting table and a substantial metal screenFiller and capper
Reg 40Conveyors built to avoid hazardous points of shear, with stopping devices, guards and warning signals at set positionsEvery conveyor between stations

 

Regulation 40 went furthest. Its first sub-regulation listed eight general conditions for conveyors under the Factories and Machinery Act, and five of them shaped the layout of a packing-line conveyor.

  • Hazardous points of shear between moving and stationary parts had to be avoided in construction and installation [reg 40(1)(a)].
  • A walkway at least 18 inches (457 mm / 1.5 ft) wide, with guard rails and toe-boards, was required wherever frequent access was needed [reg 40(1)(b)].
  • Emergency stopping devices went at loading and unloading stations, at drive and take-up ends, and at other frequent and convenient places [reg 40(1)(e)].
  • Inclined conveyors needed a mechanical device that stopped the machinery reversing when power was cut [reg 40(1)(f)].
  • Conveyors running to points out of sight of the control station carried warning signals, to be used before starting [reg 40(1)(h)].

Regulation 40(3) gave belt conveyors under Act 139 a figure: a guard at each nip-point, extending not less than three feet (0.91 m / 91 cm) from the nip-point. DNC uses this list as the starting set for a conveyor guarding specification. A pull-cord stop, a nip-point guard and an anti-reverse device are not old ideas. None has aged.

The parent statute, the Factories and Machinery Act 1967, ended through a short repeal law, Act 835, which has only six sections.

Act 835 repealed the Act on 1 June 2024

Act 835 repealed the Factories and Machinery Act 1967 with effect from 1 June 2024. Parliament passed the Factories and Machinery (Repeal) Act 2022 with Royal Assent on 4 March 2022 and Gazette publication on 16 March 2022. Section 1(2) left the start date to the Minister, and section 3 holds the whole operative text of the repeal: “The Factories and Machinery Act 1967 is repealed.”

The gap between publication and commencement of the repeal of the Factories and Machinery Act was two years and three months. On 2 April 2024 the Human Resources Minister signed the gazettes that closed it, and the Bernama report carried by Malay Mail put Act A1648 and Act 835 into operation on 1 June 2024. Skrine’s alert of 3 April 2024 named the two instruments made alongside them: the Occupational Safety and Health (Plant Requiring Certificate of Fitness) Regulations 2024 [P.U.(A) 99/2024] and the Occupational Safety and Health (Licensed Person) Order 2024 [P.U.(A) 100/2024].

DOSH drafted the new subsidiary legislation under Act 514 to replace the old subsidiary legislation under the repealed Act. The ministry described the aim as “a smooth transition of provisions” with “minimal impact on the industry”. Whether a given plant felt minimal impact depended on one thing: what happened to the certificates and approvals it already held.

Certificates and approvals carried over under the 1994 Act

Certificates and approvals issued under Act 139 carried over, because section 4(1) of Act 835 sends every such instrument to the 1994 Act. The section names nine kinds of instrument: registrations, orders, notices, directions, written authorities, approvals, certificates of fitness, special schemes of inspection and certificates of competency. On commencement each “shall … be dealt with under the Occupational Safety and Health Act 1994”.

Two sets of matters stayed behind. Section 4(2) keeps notices issued under sections 19(2), 39(3) and 40(4) of the Factories and Machinery Act under the repealed Act, as if it had not been repealed. Section 5 does the same for seven pending matters: applications for a certificate of competency or written authority, permission to use premises as a factory, approval of a machinery installation, an inspection under section 36(3), an appeal under section 36(6), a periodic inspection under section 40, and an application for a special scheme of inspection. Section 6 lets pending proceedings, prosecutions and investigations under the old Act continue to completion.

Act 835 does not restate the term of a carried-over Act 139 certificate. DOSH released an FAQ on 20 May 2024 that, according to the enviliance summary, covers the expiry and renewal of certificates of competency and machine conformity certificates. The FAQ itself, not a summary of it, settles the case of an individual carried-over certificate.

Summary: the repeal moved the legal basis, not the machinery

The repeal of the Factories and Machinery Act moved the legal basis of machinery safety in Malaysia from a machinery-specific statute to the general 1994 Act, and left the machinery in place. Certificates and approvals carried over under section 4 of Act 835. The conveyor stayed machinery in the old Act’s plain words, but the 2024 plant list excludes it. DOSH lists the 1970 guarding regulations as abolished, so the duty to keep plant safe now rests on the general duties of Part IV of Act 514 rather than on a conveyor-specific rule.

Factory Automation applied in industries

Factory Automation applied in industries

The 1994 Act now carries the duty, with a ten-times fine ceiling

The 1994 Act now carries the machinery duty through the general provisions of Act 514, and Act A1648 raised the fine for breaching the duties from RM50,000 to RM500,000. Section 19 of Act 514 carries that penalty and, as amended, covers contraventions of sections 18A and 18B alongside the earlier duty sections. The Factories and Machinery Act’s own ceilings were RM100,000 under section 51(1) and RM50,000 under section 51(2).

READ:  Filling Machine Guide: Fill Size Sets Speed and Accuracy

Scope widened with the fine. Section 1(2), as amended, applies Act 514 “to all places of work throughout Malaysia”, including the public services and statutory authorities, subject to the work listed in its First Schedule. The Factories and Machinery Act covered factories and machinery; its successor covers the place of work around them.

Two new sections change how a line project, once governed by the Factories and Machinery Act, is contracted and planned. Section 18A makes a principal responsible for the safety and health of contractors, subcontractors and their employees, and its list of necessary measures opens with “the provision and maintenance of plant and systems of work that are, so far as is practicable, safe and without risk to health”. The duty applies where the contractor works under the principal’s direction as to the manner of the work, which in DNC’s reading covers a factory that directs an integrator during commissioning. Section 18B requires every employer, self-employed person or principal to “conduct a risk assessment” of the risk to anyone affected by the undertaking, and to implement the control that the assessment calls for.

Whether a machine also needs a certificate of fitness, as section 19 of the repealed Act asked, is a separate question that the plant list answers.

Conveyors and packing machines sit outside the certificate-of-fitness list

Conveyors sit outside the certificate-of-fitness list in Regulation 3 of the 2024 Regulations, because Regulation 21(b) and the Third Schedule exclude conveyors. Act 139 called the conveyor machinery, and the 2024 list reads it differently. Regulation 3 prescribes three plants: a steam boiler, a pressure vessel and lifting machinery. Regulation 2 defines lifting machinery as “any equipment for lifting, raising, transporting or lowering loads”, and it defines material handling equipment as lifting machinery that is “power-driven equipment for handling material”, naming forklift, conveyor and automated storage retrieval system among the examples.

By that definition alone a conveyor is lifting machinery, as it was machinery under Act 139, and lifting machinery is on the list. Regulation 21(b) then disapplies the Regulations to “lifting machinery as specified in the Third Schedule”, and item 1 of that Schedule reads “Lifting machinery for material handling equipment”. Items 8 and 10 add a vertical conveyor on a predetermined route and equipment with an automatic storage and retrieval system. The definition draws the conveyor in. The Schedule takes it out. A reader who stops at Regulation 2 reaches the opposite conclusion, which is why the Schedule matters.

A filler, capper, strapping machine or carton sealer was machinery under Act 139 and is none of the three prescribed plants in 2024. DNC reads a palletizer the same way, as power-driven equipment for handling material, while DOSH decides edge cases such as a hoist-type lifter. Hoists, lifts, tower cranes and overhead travelling cranes above 4,000 kg (4 t / 8,818 lb) safe working load sit in the Seventh Schedule, which governs installation by a competent person.

Section 36 had an approval gate that general machinery no longer has

Section 36(1)(a) of Act 139 required the Inspector’s written approval before any machinery was installed in a factory, and the 1994 Act, in the texts reviewed, has no equivalent for ordinary machinery. Section 27C(1) of Act 514 asks for the Director General’s written approval only for plant that the Minister prescribes under section 27B. Regulation 3 prescribes three plants, and the conveyor sits under an exclusion from the third.

In DNC’s reading, the installation approval that once covered every machine in a factory disappeared for conveyors, filling machines and packing machines on 1 June 2024. Pending approvals under the old section 36(1) still run under the repealed Act by section 5(c) of Act 835. The five texts reviewed contain no other installation approval for general machinery, and DOSH or counsel confirms any special case.

Air receivers on a line still need checking against the Second Schedule

A compressed-air receiver on a line is a pressure vessel under the 2024 Regulations unless the Second Schedule excludes the vessel. The Regulations define a pressure vessel as “an enclosed vessel with pressure greater or less than atmospheric pressure”, and a receiver holding compressed air matches that wording. Act 139 also listed unfired pressure vessels as machinery, so the category is not new.

The Second Schedule lists ten exclusions. Three are quick to test: a design pressure not above 15 PSIG (103 kPa / 1.03 bar gauge), whatever the size; an internal diameter, width, height or cross-section diagonal not above 6 inches (152 mm / 15.2 cm); and gas cylinders used to store and transport compressed, dissolved or liquefied gases. A vessel packaged inside a machine meets other items on the list. DNC recommends checking every vessel on a line, each one a machine in Act 139’s list, against all ten before the scope of supply is written.

READ:  Conveyor Dorner Solutions for Precision Automation

Under Act 139 and Act 514 alike, each of these checks ends in the same place: the specification the line is built to.

A line specification now has to carry the guarding that the regulations once wrote

A line specification now has to carry the guarding that the 1970 regulations under the Factories and Machinery Act once wrote, because on DNC’s reading no certificate and no installation approval catches it afterwards. The duty chain that remains is the risk assessment under section 18B and the principal’s duty under section 18A. A specification that keeps the 1970 devices gives that assessment a recorded starting set, while one that drops them leaves it to start from a blank sheet.

DNC Automation recommends that a conveyor and end-of-line specification, written to the standard of the repealed Act, fix six items before quotation.

  • Risk assessment: one assessment per machine group, with each control it calls for written into the scope of supply, as section 18B requires.
  • Emergency stops: positions at loading and unloading stations and at drive and take-up ends, the 1970 locations, as the minimum set.
  • Nip-point guards: belt conveyors guarded at each nip-point, extending three feet (0.91 m / 91 cm) from it unless the assessment justifies another distance.
  • Incline protection: an anti-reverse device on every inclined conveyor.
  • Start-up warning: a signal before starting any run that is out of sight of the control station.
  • Ownership: a written split between the factory as principal and the integrator for who holds each guard and interlock through commissioning, as section 18A frames it.

The same list, taken from the Act 139 regulations, applies to the reject station of a checkweigher and to a strapping machine at the end-of-line. Packaging line safety standards from ISO and CE sit beside Act 514 on such a line, and DNC’s packaging line safety standards guide covers them. DNC’s guide to material handling equipment lists the equipment classes, from conveyors to automated storage, that the 1967 and 2024 definitions between them name. Four questions follow from reading these definitions against the repeal.

DNC automation machine

Frequently Asked Questions

Frequently asked questions about the Factories and Machinery Act 1967 concern its repeal, its certificates and its guarding rules, and each answer names the section it rests on.

Is the Factories and Machinery Act 1967 still in force?

No, the Factories and Machinery Act 1967 is repealed from 1 June 2024. Section 3 of Act 835 repeals the Act, and Act 835 took effect on 1 June 2024. Section 6 of Act 835 keeps pending proceedings, prosecutions and investigations under the old Act alive until they finish.

Does a conveyor need a certificate of fitness in Malaysia?

A conveyor does not need a certificate of fitness in Malaysia, because Regulation 3 of the 2024 Regulations does not prescribe it, although Act 139 named it machinery. Regulation 21(b) and item 1 of the Third Schedule exclude lifting machinery for material handling equipment, which Regulation 2 defines to include conveyors. A pressure vessel or a lift on the same site is a separate question, and this reading is not legal advice.

Which law covers machine guarding now?

Machine guarding now rests on the general duties of the Occupational Safety and Health Act 1994, including the risk-assessment duty in section 18B. DOSH lists the 1970 guarding regulations under the Factories and Machinery Act as abolished, and none of the five texts reviewed names a successor conveyor-specific guarding regulation.

What happened to certificates of competency issued under the old Act?

Certificates of competency issued under Act 139 are dealt with under the 1994 Act, by section 4(1) of Act 835. A pending application for a certificate of competency continues under the repealed Act by section 5(a).

Specifying to the 1970 standard keeps the repeal from becoming a gap

Specifying to the 1970 standard keeps the repeal from becoming a gap in your production line’s protection. The Factories and Machinery Act 1967 ended, its certificates moved to Act 514, and the conveyor left the certificate list. The guarding duty stayed with the plant.

Three dates and three numbers carry the story. The Factories and Machinery Act came into force on 1 February 1970 and its repeal began on 1 June 2024. Fines for breaching the general duties rose from RM50,000 to RM500,000, a certificate of fitness under the 2024 Regulations lasts fifteen months from inspection, and the plant list has three entries: steam boilers, pressure vessels and lifting machinery. A line owner who holds those figures can read any DOSH notice against the text.

For a turnkey conveyor or end-of-line project in your facility, DNC Automation’s engineers fix stop points, guards and risk-assessment inputs at specification stage, to the standard the Factories and Machinery Act set, before commissioning. To scope them for Malaysia, talk to our engineers. This article is an engineering reading of published texts, not legal advice, and DOSH or counsel confirms any specific case.